PG&E Meter Installation Cost: What to Expect

PG&E Meter Installation Cost: What to Expect

If you've ever wondered about the pg&e meter installation cost, you're not alone—this figure often plays a pivotal role when planning any electrical upgrade or panel service. Whether you're considering a new installation, an upgrade, or preparing for added loads like EV chargers or a solar system, understanding these costs helps you budget more accurately.


In this post, we’ll break down typical factors that influence meter installation pricing, walk you through what to expect, and highlight how Alpha Omega Electric makes the process clear, compliant, and hassle-free.


What Influences PG&E Meter Installation Cost?


1. Type of Installation Required


Meter installations can vary widely depending on whether you need a new meter for increased load capacity, a replacement of an outdated unit, or relocation for remodels. Simple replacements tend to be less expensive, while new installations often require coordination with PG&E, trenching, or changes to service lines.


2. Electrical Panel Compatibility


If your electrical panel doesn't support the current or anticipated loads, you may need a panel upgrade before changing the meter. In the Bay Area, upgrading from 100A to 200A panels generally costs between $2,500–$4,000, although PG&E may estimate between $2,000–$6,000 depending on complexity.


3. Utility Coordination and Permitting


Any time you alter your meter or panel, you'll need permits and inspections, and potentially coordination with PG&E for service upgrades. These procedural steps can add both time and cost—but are essential for safety and compliance.


4. On-Site Conditions


Accessibility matters. Moving a meter further from the street or requiring underground lines can significantly increase labor, materials, and, by extension, cost. For instance, overhead service upgrades are typically simpler and cheaper than underground setups.


5. Regional Labor and Material Costs


In high-cost regions like the Bay Area, licensed electricians (especially C-10-certified in California) command premium rates. Labor often comprises a substantial portion of the total cost for installations, upgrades, and PG&E coordination.


Typical Cost Ranges You Can Expect


As an example, Bay Area homeowners upgrading service underground may face significantly higher costs—one estimate cited $18,500 for a 200A underground service upgrade including trenching and PG&E coordination.


Why Accurate Estimates Matter


A clear, upfront estimate helps avoid surprises down the line. You want to know:

This transparency empowers you to plan better and ensure your home’s electrical infrastructure remains safe and future-ready.


How Alpha Omega Electric Simplifies the Process


At Alpha Omega Electric, we specialize in making meter and panel installations smooth and meticulous:


Example Scenario: Home EV Charger Addition


Planning to add an EV charger? That extra load may require a higher-capacity meter and panel.

We help you navigate both sides of the install—meeting your electrical needs while coordinating smoothly with PG&E.


Final Thoughts


Understanding the pg&e meter installation cost is vital for any homeowner looking to upgrade their electrical system. Costs vary based on installation type, panel compatibility, utility coordination, accessibility, and labor rates. Transparent estimations prevent surprises and ensure projects stay on track.


When you’re ready, reach out to us. With Alpha Omega Electric, you get experienced, code-compliant meter and panel services tailored to your needs—backed by clear communication and trusted workmanship.


Conclusion


Accurate understanding of "pg&e meter installation cost" isn’t just about numbers—it’s about planning with confidence and ensuring your home is safe and expertly serviced. When you're seeking clarity, compliance, and superior electrical service, trust Alpha Omega Electric to deliver.